test(readme): modify QA steps to make them easier to perform

This commit is contained in:
Redstone1024 2024-04-14 20:10:47 +08:00
parent 8888c771a5
commit c69cb53f4b

View File

@ -24,9 +24,12 @@ You can refer to the following procedure to verify that the PCB is working, and
1. Ensure that there is **no shorts** for C1 C2 C23 and that their resistance is at the MOhm level.
2. Ensure that there are **no false shorts** between the IP2368 and Type-C pins and to GND.
3. Ensure LEDs are oriented and colored correctly.
4. When connected to a standard Type-C PD power supply and **without** battery, ensure the power supply should be around **20V** and **0.6W**.
4. When connected to a standard Type-C PD power supply and **without** battery.
1. Ensure the power supply should be around **20V**.
2. Ensure the power supply should be around **0.6W**.
3. Ensure the C2 voltage should be around **12.6V**.
5. Insert a battery of less than **50%** capacity, ensure the red light blinks **4** times and then goes out.
6. When connected to a standard Type-C PD power supply with a **50%** capacity battery.
6. When connected to a standard Type-C PD power supply with a **50%** capacity battery (**Pay attention to high temperature**).
1. Ensure the red light comes on quickly and without blinking.
2. Within IC protocol negotiation, ensure the power supply should be around **0.6W**.
3. After IC protocol negotiation, ensure the power supply should be about **24W** (12W for 5V, 9V, 12V, 15V).